Skyrise 3 Tower B
Jose Maria Del Mar Avenue Lahug
Skyrise 3 Tower B is a 24-storey, PEZA-accredited Grade A office building on Jose Maria del Mar Avenue in Cebu IT Park, Barangay Apas, Lahug, Cebu City. Developed by Skyrise Realty and Development, it was completed in 2022.
The tower offers about 20,000 sq m of gross leasable area on typical floor plates of about 1,100 sq m. A 90% efficiency ratio means most of each floor is usable workspace, and the ceiling height is 2.7 m. Four elevators serve the building.
It operates 24/7 with 100% backup power and variable refrigerant flow air conditioning. Retail establishments are in the surrounding area of the IT Park.
Skyrise 3 Tower B
Building Photo
Skyrise 3 Tower B
Floor Plan
Skyrise 3 Tower B Building Details
- Address
- Jose Maria Del Mar Avenue Lahug
- City
- Cebu City
- Submarket
- Cebu IT Park
- Class
- Grade A
- PEZA
- Yes
- Year Built
- 2022
- Telcos
- Rise, PLDT, Globe, Smart
- Amenities
- Retail establishments in the area